Division 6
:: GBAccelerator: GBA-SP Installation Instructions
GBAccelerator: GBA-SP Installation Instructions
Disassemble your Game Boy Advance SP
Desolder and remove crystal X1
Place the GBAccelerator on the PCB between the ARM processor and the cartridge connector as shown in diagram
Make connections as shown in diagram
Reassemble your GBA-SP
GBAccelerator Connections
GND
Cartridge Connector Pin 32
V+
Cartridge Connector Pin 1
CLK
CK1 (solder pad where xtal used to be)
LED
DL2A
BUTTON
TP2
BUTTON
TP8
BUTTON
TP9
Installation Tips:
Do not take the GBA-SP screen apart; it is only necessary to disassemble the base
You may need to use some electrical tape between the GBAccelerator and the cartridge connector to prevent accidental contact
Use low-wattage, fine-tipped soldering iron
Use flux or rosin-core solder
Don't hold the iron on the GBAccelerator or the GBA board too long as you may lift the solder pad
30-gauge wire is recommended
Follow wire routing indicated in diagram so wires don't cross white areas, screw holes, or tall components
Cut off excess wire length
The three button connections on the GBAccelerator are interchangeable; it does not matter which one goes to which button
If alternate button assignments are desired, see button signal list for available connection points
You may need to trim some of the plastic standoffs from the back cover of the GBA-SP if the cover does not seat properly upon reassembly
Button Signal List
TP0-
A
TP1-
B
TP2-
Select
TP3-
Start
TP4-
Right
TP5-
Left
TP6-
Up
TP7-
Down
TP8-
R
TP9-
L
Copyright © 2002-2008 Division 6
Your cart
Cart is empty
View cart
Checkout
Account
Username
Password
Log in
Register
Recover password
Help
Forums
Support
Contact us
FAQ
Privacy statement
Terms & Conditions